Window Fitters Guide to Window Installation 119 ©2022 AWDI, LLC Do not reproduce without permission 4. Prior Weather Sealing All Flashing should be done prior to mounting the new window. Install proper flashing on all four sides wrapping the header and jambs and sill. The sill flashing should be in a sill pan fashion with side and back dams to direct water to the outside. The recommended method of flashing the sill would be with slow expansion compressed sealing foam. The foam should be placed on the sill with cut-outs for the capture blocks as shown. The slow expansion foam can be used on the jambs and head and can be installed prior to installing the window into the opening, or placed in the gap once the window is set in place. It should be placed into the gap along the header and jambs from the outside to accommodate the jamb clips. The foam tape can be left exposed to the elements or if recessed sufficiently, can serve as backer rod for exterior application of sealant. Choosing to use spray foam will require accurate application of foam beads in the header, jamb and sill gaps and backer rod on both the interior and exterior. The sill gap needs to allow two places for proper drainage to the exterior. Wood Framing needs to be properly flashed and with a sill pan prior to mounting the win- dows. Concrete Block Wall needs to be sealed, with proper sill drainage before the windows are mounted. Use a Wood Surround in a Masonry Opening, properly sealed with flashing tape and/or foam sealing tape. Properly flash the opening. Wrap the header and jambs with flashing tape and use slow expansion foam seal- ing tape along the bottom or a sill pan. Similar to Frame replace- ment, place a wood buck in the opening to cover the left-in-place remnants of the old window. New Construction Masonry Wood Buck Wood Frame Replacement Masonry w/ Wood Buck SAMPLE MANUAL
View this content as a flipbook by clicking here.