Window Fitters Guide to Window Installation 102 ©2022 AWDI, LLC Do not reproduce without permission Step 3: Using another layer of flashing, starting with the sill, overlap strips to cover the jambs and header also. If you choose to apply building paper, start the first strip tucked under the bottom (sill) flashing. The goal is always to overlap in ship lap fashion to direct water down and away from the new window. Step 4: Finish installing the overlapping building paper. Remember to leave the bottom of the window unsealed to allow drainage of any water or condensed moisture in the opening cavity. Step 5: Integral J-Channel frames allow installation of the siding by “tucking” it inside the space created by the j- channel and the window frame. Step 6: Finish applying the exterior siding or paneling - or even stucco. Proper drainage and finish trim all in one application. Integral J-Channel Install SAMPLE MANUAL
View this content as a flipbook by clicking here.