Window Fitters Guide to Window Installation 5 ©2022 AWDI, LLC Do not reproduce without permission Application: The new window must be installed plumb, level, and square. Make sure loads from the wall above are not transferred to the window. Shimming: All shimming should be done with the proper pressure to the mainframe of the newly installed window to guarantee the proper operation of the window sashes. The shims should be made of a material that is hard enough to support the window, provide good thermal insulation, resist decay, and allow for fastening to run through. Fastening: To fasten the window properly to the opening, use corrosion resistant fasteners of sufficient size and length to permanently anchor the new window. In most cases, these anchors are supplied with the window unit. 1. Fastening for Replacement or Renovation: Fasten to the jambs, and/or head sections of the left-in-place frame using corrosion resistant screws, or nails when conditions permit. Use non-tapered shims as needed, and install at all fastening points. 2. Fastening for New Construction: Fasten the “new construction” vinyl window into the opening structure by fastening the integral fin. Take care to allow for natural expansion and contraction of the window or door fin. Use cap-nails along header as shown elsewhere. Shim any gap present between the new window and the opening, as needed. Use corrosion resistant fasteners. Caulking: 1. Replacement: Use caulking during mounting of replacement vinyl windows as follows: Inside/Out Application- Apply caulk to the back of the exterior stop, and under the sill when the newly installed window is mounted against the exterior stop leaving weep gaps. Outside/In Application- Apply caulk to the back of the interior stop, and under the sill when the newly installed window is mounted against the interior stop. 2. Renovation & New Construction: Caulking alone is not recommended for use during renovation or remodeling installation. Instead, use proper flashing methods described in detail elsewhere. Insulation: After new vinyl window is mounted in the opening, inject PU foam between the window and the rough opening (RO) to insulate any perimeter voids between the mainframe of the new window, and the opening. Do not compress the insulation to avoid pressure on the frame of the new window that will distort the frame, which could impede smooth operation of the new window. It is also recommended that a proper air seal on the warm side of the insulation be provided. Interior Air/Moisture Seal: It is recommended that an air and moisture seal be provided on the interior side of the rough opening gap using sealant, or Barrier Tape. To prevent drafts, heat loss, and further reduce the potential for the formation of condensation between the wall and the new window, it is essential that the rough opening gap doesn’t allow air and moisture to pass between the new window and the existing wall into the opening cavity. 1. Sealant Method: Apply Caulk/Sealant to the interior side of the rough opening in a continuous manner to provide an even, unbroken sealant bead sufficient to fill the gap between the new window and the rough opening. Where needed, foam or rubber backer rod can be used as a “bond breaker” ensuring that the sealant only bonds to the window frame and the rough opening. 2. The Barrier Tape Method: Tape that is impervious to air and moisture, with adhesive of sufficient strength to adhere to wood, vinyl, metal, or plastic shall be placed across the rough opening gap adhering to the dry wall on one side of the gap, and the interior surface of the window frame on the other, or between the new window frame and the left-in-place frame. Application, Shimming, Fastening, and Sealing EXTERIOR SEAL INTERIOR SEAL INSULATION FASTENING SHIMS PLUMB/ LEVEL Jamb Extension Builders Tape SAMPLE MANUAL
View this content as a flipbook by clicking here.