Basic Door Installation Step 1 Standard construction steps apply. Proper framing and sheathing is also assumed as shown. The sill is shown as even with the deck — perhaps the toughest to make level as required for proper installation. Drip sill (set down 1/2” to 3/4” is better because it’s easier make level after the deck is built, and to accommodate the sill pan. Drop sills are more effective at keeping water from blowing under the doors, as well. These instructions are basic for either approach. Step 2 After the sheathing is applied to the wall, install 9” wide, flexible flashing on the sill, overlapping the sill plate, and up the jambs, 6” to 9” high. Place a bead of caulk/sealant along the top of the flashing to help secure the sill pan. Prepare metal sill pan, or use a pre-manufactured plastic pan and place on top of the flashing — tight between the jambs — with the lip of the sill pan against the sill plate. If shims are needed, use flat shims of 1/8” or less. Make sure they lie in a bead of caulk/sealant. Window Fitters Guide to Window Installation 110 ©2022 AWDI, LLC Do not reproduce without permission SAMPLE MANUAL
View this content as a flipbook by clicking here.