Window Fitters Guide to Window Installation 96 ©2022 AWDI, LLC Do not reproduce without permission Most manufacturers of vinyl windows supply an optional nailing fin that can be easily attached to the perimeter of the window on all four sides. There are also integral nailing fins that are permanently part of the frame of the vinyl window. These integral fins are most commonly available on single-hung and single-slider windows. Vinyl Windows with nailing fin allow them to be installed in a conventional manner for new construction applications. Instructions for New Construction These instructions are meant as a guide only. Code compliance and architectural design may create situations that differ from the illustrations. Some modification may be required, but these instructions will cover the basic elements of most installations. If there is no existing rough opening, construct an opening like Figure 1, 1/2” larger in height and width than the window to be used. If there is an existing rough opening, order a window 1/2” smaller in height and width. The rough opening should look similar to Figure 1. No window should be installed without a proper header and sill support. All framing should be in compliance with local codes. Figure 2 shows the completed rough opening. Sheathing can be plywood, or structural insulation board. The important consideration is that the win- dow can be nailed through the sheathing material to solid framing - the header, rough sill, and jack studs. METHOD “A” METHOD “B” Installing Vinyl Windows in New Construction Rough Sill Jack Stud King Stud Sheathing Cripple Studs Rough Header BASIC WINDOW FRAMING Method “A” and “B” There are two basic methods of flashing: Method A where the Weather Resistive Barrier is applied after the window is mounted, and Method B where it is applied before window mounting. These instructions focus on method “B” with brief reference to the “A” method. Either way the bottom line is divert the environmental water, drain any that makes its way inside, and dry whatever is left. Proper flashing and sill pan is the key. Fig. 1 Fig. 2 METHOD “B” METHOD “A” SAMPLE MANUAL
View this content as a flipbook by clicking here.